avenity-workspace

AI Overview Placement Timeline

A running, dated count of every screenshot- or query-log-verified AI-system placement documented across Avenity Business Solutions’ case studies — Google AI Overview, Google AI Mode, ChatGPT, Google Gemini, Perplexity AI, and Grok. This excludes plain organic Google rankings (not AI-generated) and excludes “same cluster” phrases that are listed as candidates but have not actually been tested.

Total as of September 4, 2026: 24 confirmed placements

This is a living document. New confirmed placements get added with their date; existing entries are never backdated or reworded after the fact — if a result changes (holds, expands, or drops), that’s a new dated entry, not an edit to the old one.

Running total by month

Month New placements Running total
March 2026 3 3
April 2026 13 16
May 2026 1 17
June 2026 4 21
August 2026 2 23
September 2026 1 24

How dates are sourced

Where a case study states an exact capture date or timestamp (e.g., “captured August 24, 2026” or “12:22 PM CDT”), that date is used directly. Where a case study only states a season or a publish month (“spring 2026,” “published June 2026”), the entry is bucketed to that month and marked approximate. Screenshot images embedded in the existing case studies are cropped to the browser window only — none currently include a visible system-clock timestamp in the corner, so date provenance here comes from the captions/labels already written into each case study, not from reading pixel timestamps off the images themselves.


March 2026

ADORA Private Security — Conroe, TX

Dewberry Farm — Brookshire, TX

Running total through March: 3

April 2026 (approximate — bucketed to stated month)

ADORA Private Security — Conroe, TX (screenshots taken late April 2026 for the 90-day audit)

Easley Enterprises of TX — Montgomery County, TX (case study published April 2026, results run “spring 2026”)

The Perfect Round — Conroe / North Houston, TX (engagement began April 1, 2026; case study does not state a separate capture date)

Running total through April: 16

May 2026

Battlefield Trailer Solutions — Conroe / Montgomery County, TX

Running total through May: 17

June 2026 (approximate — bucketed to stated month)

Simply Better Roofing — Franklin / Robertson County, TX (case study published June 2026, results run “spring 2026”)

Running total through June: 21

August 2026

Radiate Coalition — Honduras aftercare program

Running total through August: 23

September 2026

Dewberry Farm — Brookshire, TX


Running total through September 4, 2026: 24

Known gaps in the record (not counted above)

Methodology note

A placement counts here only when a specific query phrase and a specific AI platform are both named, backed by either a screenshot or a directly quoted AI response, in a published case study or a message from Avenity leadership documenting a live test. Plain Google organic rankings, Knowledge Panels, and untested “same cluster” phrases are tracked separately and are not included in the total.